A = Length × Width9 m²Show Calculation
- Engineering inputs
- Length 3 m; width 3 m
- Formula
- A = L × W
- Substitution
- 3 × 3
- Calculation
- 9 m²
- Final result
- 9 m² room area

Select the appropriate BES indoor-air platform and evaluate room coverage, installation architecture, operating profile and engineering suitability.
Choose the engineering architecture.
Generated when Export PDF is selected
Room area
3 × 3 = 9.0 m²
Room volume
9.0 × 2.6 = 23.4 m³
Coverage / airflow utilization
Verified product coverage data required
Mode 2 produces a verified 10 min on / 10 min off pattern with 4 EOG hours per day. Final room suitability and quantity require a verified HAS Mini coverage specification and site circulation review.
Enter the room and operating conditions to calculate coverage where verified, review operating mode and installation architecture, and identify data still required.
A = Length × Width9 m²V = Area × Height23.4 m³Tactive = Tavailable × Duty4 h/dayService days = Rated hours ÷ Daily active runtime250–500 daysPreliminary engineering selection only. This workflow does not confirm sterilization, pathogen kill, ozone exposure safety or final commissioning acceptance.
The BERE blueprint updates product placement, room geometry, airflow direction and engineering annotations from the active platform.
Review the estimated concentration trend against the selected engineering reference and the cumulative exposure trend across the operating window.
Performance curves are presentation estimates based on the selected operating duty and do not modify product sizing, recommendation logic or commissioning acceptance.
Five essential checks summarize the active preliminary selection without repeating the detailed input and recommendation panels.
Generate a print-ready BES report containing the live project inputs, diagram, performance graphs, calculation summary, recommendation and engineering remarks.
A preliminary selection based on the verified platform data and current site inputs.
Mode 2 produces a verified 10 min on / 10 min off pattern with 4 EOG hours per day. Final room suitability and quantity require a verified HAS Mini coverage specification and site circulation review.
Detailed engineering interpretation follows the platform’s verified architecture rather than forcing every product into one generic formula.
Define the daily window available for cycling.
Only the documented ON periods consume EOG life.
No room-coverage value is inferred from the duty pattern.
Select a documented duty pattern and verify the local circulation zone.
Use a stable position close to the intended delivery point.
Keep the local delivery and circulation path unobstructed.
Commission one of the documented continuous or intermittent modes.
Confirm occupancy authorization and site circulation before operation.
This is an engineering screening workflow, not a clinical claim. It does not confirm sterilization, pathogen kill, log reduction or safe ozone exposure.